New Lockwood High School
Lockwood Schools has passed a $49.9 million-dollar bond to build a new High School, auxiliary CTE building, and an outdoor football stadium capable of housing 700 students. High Tech Solutions is under contract to provide all special systems including: Fire Alarm, Security, Access Control, CCTV, Intercom, Clock, Structured Cabling, and Fiber sitework. We shall be expanding upon the existing Edwards (EST) networked fire alarm system to include the new High School, CTE building, Maintenance building, and Stadium. All new buildings onsite will have installed new access control and video management software by Lenel/S2 Systems with Vivotek cameras. They shall also have installed the new Bogen E7000 IP Hybrid Intercom system with system synchronized clocks throughout. The cabling infrastructure including all category and fiber cable shall all be OCC product installed by our MDIS Certified Technicians so the school district shall receive a 25-warranty on telecommunications cable plant.